Plan tarp placement, nail containment, and truck access without turning the pickup crew into roof workers. The goal is to give the hauling crew enough detail to assess the work without burying the useful facts.
Define the handoff
Confirm whether the roofing crew will place debris at ground level or directly into a container. This service covers hauling staged ground-level material, not roof tear-off or work at height.
Contain nails and small scraps
Use tarps or sturdy containers for loose shingles, underlayment, flashing, and fasteners. Keep the pile out of drive lanes and away from areas children or pets use.
Estimate layers and area
Tell the hauler the approximate roof area and number of shingle layers when known. Roofing loads become heavy quickly, so a photo alone may not tell the full story.
Leave a clear truck route
Move vehicles, keep the driveway open, and identify overhead branches or wires. If the pile is behind the house, explain the gate width and carrying distance.
Ready to discuss the load?
Use the checklist, take a few clear photos, and call (716) 671-0756 with the job address.
Call about the project